BonnieArbittier_cruz_ortiz_sculpture_installation_crane_construction_art_artist_11-30-2017-5

Construction workers watch as the last section of the Dream Song Tower is placed on the top of the structure.

Construction workers watch as the last section of the Dream Song Tower is placed on the top of the structure. Credit: Bonnie Arbittier / RIvard Report

Construction workers watch as the last section of the Dream Song Tower is placed on the top of the structure.